Meter reading

Hi I’ve posted my readings on 16th ones registered as 16 the other next week

Hi @chrispointon, if your switch date is the same as the later reading is showing as, both will change to that once they’ve worked their way through the system.

Switch date suppose to be 16th sent readings to old supplier for final bill

@chrispointon your switch date is 22nd December, so it looks like @mowcius 's suggestion is correct. We will be passing those readings on to your previous supplier to use as switchover readings.