Hi there,
I’ll be moving into a house that has been vacant for several months. I don’t believe it was supplied by Bulb, but I’m planning to stick with Bulb when we move over.
In cases when moving into a vacant house, does Bulb have engineers that will check the the Gas/Electric after the house has been reconnected (e.g. making sure the central heating is working/electric systems are safe etc.) or is that something we will have to organise ourselves with a third part Electrical/Gas engineer?
Thanks,
Sam.